Home / The guide / Blackout continuity
Blackout continuity · Audit your dependencies and set targets · continuity-3Pick your critical loads and decide what runs on what
In a long outage you will not run everything. Choose the few loads that keep people safe and the estate working, and give each one a primary and backup energy source.
How
- From the power module load audit (power-1), mark critical loads: water pump, fridge or freezer, lights, comms and radio charging, medical devices, battery charging for tools, ventilation.
- CISA advises segmenting and prioritising loads so backup fuel lasts longer, and planning for start-up surges as well as running loads.
- For each critical load write: normal source (solar and battery), backup (generator), manual fallback (hand pump, cool box, lantern, hand tools).
- Move as many loads as you can to daytime solar hours, so the generator only fills real gaps.
- Write the running watts and start-up watts of each critical load from the nameplate or manual. You will use them in the generator sizing calculator.
Do these first
Sources
- Ten Steps of Resilient Power. US Cybersecurity and Infrastructure Security Agency (CISA), accessed 2026-11
- Generator sizing considerations. Eugene Water & Electric Board, accessed 2026-11