Home / The guide / House design
House design · Detail the envelope · design-16Design the air barrier and set an airtightness target
Air leaks can cause 15 to 25 percent of winter heat loss (Your Home). An airtight house needs a planned, continuous air barrier and a planned fresh-air supply.
How
- Pick one layer as the air barrier (taped sheathing, membrane, plaster or SIP skins) and trace it around every wall, roof and floor junction on the drawings.
- Detail tape and seal points at windows, doors, service penetrations and the wall to roof junction. DOE lists at least 19 key leak areas.
- Set a measured target with your designer. For reference, the Passive House standard limits leakage to 0.6 air changes per hour at 50 Pa (ACH50); some codes set looser climate-based limits.
- Design controlled ventilation (for example heat recovery ventilation) with the thermal module; DOE warns tight homes need planned ventilation to avoid moisture and combustion gas build-up.
- Plan a mid-build blower door test before linings close (design-21).
Safety: Any wood stove or combustion appliance in a tight house needs its own outside air and a professionally checked flue (thermal and safety modules).
Sources
- Passive heating. Your Home, Australian Government, accessed 2026-11
- Consumer Guide to Air Sealing the Home (DOE/EE-2470). US Department of Energy, Energy Saver, accessed 2026-11
- Passive House standard method (BASIX thermal performance). NSW Government Planning Portal, Australia, accessed 2026-11
- Passive design. Your Home, Australian Government, accessed 2026-11