House design · Documents and build sequence · design-19Prepare permit-ready drawings and hand off to legal
Authorities, builders and engineers all work from the same drawing set. A complete set prevents costly changes on site.
How
- Assemble: site plan, floor plans, elevations, sections, roof plan, foundation plan, wall and roof details, window schedule and structural drawings.
- Add the off-grid layers: PV roof plane, tank and gutter routes, battery room, septic or composting toilet location and service penetrations.
- Attach engineer calculations, system test data (for straw bale, earth or cob) and energy compliance reports your authority asks for.
- Hand the set to the legal module for permit submission and to get builder quotes.
- Freeze the design before construction; log any later change in writing.
Do these first
Sources
- 2015 IRC Appendix S: Strawbale Construction. International Code Council (copy hosted by Ecological Building Network), accessed 2026-11
- Cob Code Appendix Approved for the 2021 IRC. International Code Council, Building Safety Journal, accessed 2026-11
- Construction systems (Smarter Homes guides). Building Performance, New Zealand Government (MBIE), accessed 2026-11