Install the power room and wiring

Install batteries, controllers, inverter, protection and distribution in the prepared room, following the design pack exactly.

How

  1. Build to the codes in your design pack, not only the maker's manual. Examples: NEC 706 and 710 (US), IEC 62548-1 for PV arrays, AS/NZS 5139 for batteries (Australia and New Zealand).
  2. Mount equipment on non combustible backing with the clearances the makers specify.
  3. Install batteries last, with the main fuse and disconnect open.
  4. Torque all battery and lug connections to the maker's values and mark them so loosening can be spotted.
  5. Install the battery shunt (for monitoring) in the negative cable as the last item before the bank.
  6. Label every disconnect, fuse and cable.
  7. Keep the design drawings in a waterproof pocket in the power room.
  8. Make the single neutral-earth bond exactly where the design shows it (power-19).

Safety: Remove rings and watches, use insulated tools and wear eye protection when working on batteries.

Sources

  1. Wiring Unlimited: DC wiring. Victron Energy, accessed 2026-11
  2. NEC Requirements for Energy Storage Systems. EC&M, accessed 2026-11
  3. Articles 702, 705, 706, 710: Optional Standby Systems, Stand-Alone Systems, Energy Storage Systems. North Carolina Office of State Fire Marshal, accessed 2026-11
  4. IEC 62548-1:2023 Photovoltaic (PV) arrays: Design requirements. International Electrotechnical Commission, accessed 2026-11
  5. Changes to the battery standard (AS/NZS 5139:2019 Amendment 1, December 2025). NSW Government, Building Commission NSW (Australia), accessed 2026-11

Open in the interactive guide