Home / The guide / Sanitation
Sanitation · Install and commission · sanitation-18Install and get inspected before backfilling
Installation quality decides how long a system lasts. Most authorities inspect tanks and drainfields before they are covered.
How
- Keep heavy machinery off the drainfield and reserve area before, during and after construction to avoid compacting the soil.
- Do not install or work on drainfields when the soil is wet.
- Check that trench bottoms and distribution devices are level so effluent spreads evenly.
- Fit risers to the surface and check baffles are in place.
- Book the authority inspection before backfilling, and photograph everything with a tape measure in shot.
- Divert roof and paved-area runoff away from the drainfield.
Safety: Trench collapse is a serious risk. Never enter trenches deeper than your local safety rules allow without shoring.
Sources
- Decentralized Systems Technology Fact Sheet: Septic Tank Soil Absorption Systems (EPA 932-F-99-075). US Environmental Protection Agency, accessed 2026-11
- Septic Tank Maintenance (EC 1343). Oregon State University Extension Service, accessed 2026-11