Disinfect and flush the new system
New wells, spring boxes, tanks and pipes pick up dirt and germs during construction. Shock chlorination cleans them before first use.
How
- Scrub out tanks and spring boxes and remove debris.
- Shock chlorinate to about 200 ppm. NC State gives about 3 pints of 5 percent bleach per 100 US gallons (roughly 1.4 L per 380 L) and a hold time of at least 12 hours.
- Use the chlorine dose calculator on this page to scale the 200 mg/L shock dose to your volume and bleach strength.
- Run chlorinated water to every tap until you smell chlorine, then hold at least 12 hours.
- Flush with fresh water until no chlorine smell or taste remains. Do not flush strong chlorine into a septic system or onto plants.
- Wait 24 hours after flushing and take a bacteria sample (NC State).
- For wells, the driller usually disinfects after installation; ask for the record.
Safety: Shock chlorine is strong: wear gloves and eye protection, ventilate enclosed spaces, and never mix bleach with acids or ammonia.
Sources
- Protecting Water Supply Springs. NC State Extension, accessed 2026-11