Blackout-Readyby Crisis-Ready Society

Home / The guide / Water

Water · Find and assess your sources · water-6

Commission a hydrogeology check and site a well or borehole

Groundwater is invisible, so get local evidence before paying for a drill rig. Siting also decides how well the well can be protected from septic systems and animals.

How

  1. Collect local well records, geological maps and neighbours' experience. Many geological surveys and drillers hold records of nearby boreholes.
  2. For uncertain areas, hire a hydrogeologist to suggest drilling locations and likely depth and yield.
  3. Keep the well uphill of pollution. Groundwater generally follows the slope of the land, so Penn State advises putting contamination sources downhill of the well.
  4. Keep the 30 m (100 ft) zone around the wellhead free of septic systems, drainfields, animal waste, pesticides, fertiliser, fuel and chemicals, as Penn State recommends.
  5. Check your local setback code. Example, Nebraska, USA: at least 15 m (50 ft) from a septic tank and 30 m (100 ft) from a soil absorption field. Your jurisdiction may differ, so coordinate with the sanitation module before fixing either location.
  6. Leave access for a drill rig and for future pump pulling.

Do these first

Sources

  1. Protect Your Home's Water. US EPA, accessed 2026-11
  2. Protect Your Wellhead to Safeguard Drinking Water Supplies. Penn State Extension, accessed 2026-11
  3. Setback Distance From Septic to Drinking Water Well. Extension Foundation (drinking-water.extension.org), accessed 2026-11

Open in the interactive guide