Home / The guide / House design
House design · Commission and live with the house · design-22Commission the envelope with a final blower door test
The final test proves the house meets its airtightness target and gives a baseline for the ventilation design.
How
- Test after electrical, plumbing and mechanical finishes are installed, since they form part of the envelope (PNNL).
- If combustion appliances vent to the room, a worst-case depressurisation check is done first (PNNL).
- The tester pressurises or depressurises to 50 Pa, records the airflow (CFM50 or m3/h) and calculates ACH50 = airflow per hour divided by house volume.
- Compare the result to your target from design-16. Keep the report for permits and future buyers.
- Hand results to the thermal module to set ventilation rates.
Safety: Clear stove ashes and seal fireplaces before depressurisation tests to avoid drawing ash or fumes inside.
Sources
- Enclosure Leakage Test (Building America Solution Center). Pacific Northwest National Laboratory for US DOE, accessed 2026-11
- Passive House standard method (BASIX thermal performance). NSW Government Planning Portal, Australia, accessed 2026-11